7. Project Risk Analysis

Project Profile Model

The Project Profile Model indicates that this project has a weighted risk score of {}and is therefore a {} risk (Level {}) project.

Project Risk Management

The purpose of this section is three fold:

  1. To alert decision makers to any risks in the project that might be material to the decision making at this point, or need to be resolved prior to a later decision;
  2. Confirm to decision makers that a thorough process has evaluated all risks relevant to the stage of the project;
  3. To ensure that a program of work is in place to address the major risks identified.

This section should concentrate on the most significant risks – a full risk analysis if completed should be appended.

In the table below, the Estimate of Risk column is optional. It can be used to identify the costs of risks that are not adequately covered by the cost plan and to emphasise areas for further attention. Risks should be given ranges. Examples might include latent conditions in a building or ground, reliance on a major funding contribution from a non-government source or reliance on a related project program and funding.

The section format might include:

A risk management plan will be developed within the Preliminary Business Case. The major project risks identified to date include:

Service Planning

{Detail Risks}

Cost Risks

Risk

Risk Possibility

Estimate of Risk ($m)

Comment

Briefed areas are low

Rate Low - Mod - High

 

 

Building cost estimates are low

 

 

 

Land costs are underestimated

 

 

 

Project Delay

 

 

 

Increase in scope

 

 

 

Costs are not included

 

 

 

Recurrent Cost Risks

 

 

 

Section should include a generic statement covering DHS CMB cost management approach. Refer to CMB for details.

Land Acquisition

{Detail Risks}

Model of Care

{Detail Risks}

Recurrent Funding

{Detail Risks}

Budget Approval

{Detail Risks, especially related to not proceeding, or deferral or delay of funding.}

Implementation Risk

{Detail Risks}

Back to top
For information relating to this page contact: Capital Management Branch, Ph: 61 3 9096 2030, capital@dhs.vic.gov.au
Site authorised by: Director, Capital Management Branch

Last Updated: 8 June, 2007
© Copyright State of Victoria | Disclaimer | Privacy statement | State Government of Victoria home | Search DHS | Download help