This section should document the solutions that have been considered for further evaluation. It is important to demonstrate that all feasible options have been identified and considered, and provide a logical argument for pursuing or discarding the option.
The solutions must include, but not be limited to:
The options need to be sufficiently defined to allow for benchmark costs to be developed.
At this stage of the project, the benchmark costs will be driven from the service planning data. Accordingly, the planning data and options need to be sufficiently defined to identify key space drivers. These might include inpatient, ambulatory numbers, numbers of procedures, EFT, specialist chairs (renal, dental etc). Other useful reference points will include previous work undertaken on the project and requirements and costs of recent comparable projects. It is desirable to estimate a range for the costs.
Solution Feasibility should include: recurrent cost data or implications, achievement of project objectives, alignment with strategy or policy, feasibility of each option, capacity for staging.
To save work later, try to make the options analysis definitive where that can be achieved (eg a non asset solution). This will enable the project to proceed with confidence in the chosen options, without having to revisit the question during the business case. This will be particularly important for smaller projects where a formal options analysis (preliminary business case) may not be performed. In that case, try to bring forward into this document consideration of options that don't justify a more detailed workup.
The following table formats may suit the project presentation.
High-level solutions for {} have been considered. Initial findings are reported below.
|
Solution |
Constraints |
Solution Feasibility |
|
1 XXXXXXXX |
|
|
OR
|
Solution |
Solution Description |
Solution Limitations |
Solution Feasibility |
|
|
Constraints |
Dependencies |
|||
|
1. XXXXXXXXXX |
|
|
|
|
The section should detail the best cost estimates available. The minimal costing expected would be the use of a benchmarking tool (eg CMB Benchmarking Tool) to indicate a probably range of project costs. For medium and high-risk projects, some form of external cost validation should be considered. More detailed cost data eg Cost pan A or better, should be used where available.
Note that not all High Level solutions need to be costed. If a high level solution is excluded because it is not feasible on non-cost grounds, there is little point in costing it. However, it is important to retain viable options and not to converge too quickly on a preferred solution – there is no issue (even a preference) in taking forward more than one feasible option to the next stages.
The section outline may include: